Do all transactions look the same?
NO
Transaction – I (closed May 2010)
- Purchased 26 current producing vertical and horizontal wells with no new wells drilled/planned
- Initial combined production of all the wells was approximately 200 BPD
- Current total production is approximately 62 BPD
Transaction – II (closed June 2010)
- Acquired a lease of approximately 200 acres
- Targeted two different production zones over a 24 month period
- Drilled and completed three vertical and one horizontal well, with initial combined production of 40 BPD
- Current total production is approximately 8 BPD
Transaction – III (closed Dec. 2010)
- Acquired three different leases of approximately 1,000 acres
- Drilled four vertical and four horizontal wells over 15 month period generating initial production of 175 BPD
- Current total production is approximately 51 BPD
Transaction – IV (closed June 2011)
- Purchased twelve producing vertical wells producing approximately 35 BPD on 1,000 acre lease
- Drilled eight new vertical wells in late 2011 and early 2012
- Lease requires significant water injection to increase production, through numerous production zones
- Water-flooding began in October, 2012
- Reserve estimates of 300,000 barrels, however, it’s difficult to determine a recovery period due to the multiple zones and size of the lease until several additional water injection wells are drilled
- Sold Transaction IV back to the Operator in December 2013 due to poor performance
Transaction – V (closed Sept. 2011)
- Drilling program consisted of 11 new wells (8 vertical and 3 horizontal wells)
- Initial production of new wells has ranged from 30 to 300 BPD
- Current total production is approximately 42 BPD
Transaction – VI (closed July 2012)
- Purchased 25 existing wells with approximately 27 BPD of production in October, 2012
- Lease consists of over 1,600 acres that sits on a large anticline (the best geologic structure)
- No previous wells were drilled in excess of 1,500 feet, nor have any horizontal wells been drilled
- Two of the largest prospects near very productive leases (Transaction – V)
- Drilling Program: 9-10 new wells
Current total production is approximately 64 BPD
Transaction – VII (closed April 26, 2013)
- Purchased 8 existing wells with approximately 13 BPD of production
- Drilling Program: 9-10 new wells
- 9 wells (6 Vertical, 3 Horizontal) were drilled and completed in 2013
- 4 wells (all Vertical) were drilled and completed in 2014
- Plan to drill 6 more vertical wells in 2015 on one of the leases
- Each well on this lease has had an initial BPD over 80
- Current total production is approximately 326 BPD
Transaction – VIII (closed Jan. 15, 2014)
- Raised $3.7 million
- Enhanced Recovery Project in Spencer County, Indiana
- 350 acre lease
- Expect to drill 12 producing and 10 surfactant injection wells
- Existing production of 15 BPD from 10 wells
- Production will slowly increase from 15 BPD to 150 BPD in 18 months
- Estimated 400,000 recoverable barrels
- Project life of 8 to 10 years
- Drilling Program: 10 new wells
- 8 vertical and 2 horizontal
- Current total production is approximately 28 BPD
Posted in: FAQ